CURT 58445 Long-Lead Mini Fuse Bypass Switch for RV Dinghy Towing
This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.
- Long-Lead Mini Fuse Bypass Switch
Information:
Long-Lead Mini Fuse Bypass Switch
Application Summary:
Year |
Make/Model |
2010-2011 |
Cadillac SRX |
2008 |
Chevrolet Equinox |
2014-2015 |
Chevrolet Malibu |
2003 |
Chevrolet Tracker |
2007-2020 |
Ford Edge |
2001-2020 |
Ford Escape |
2007-2011 |
Ford Explorer |
2009-2019 |
Ford Flex |
2006-2020 |
Ford Fusion |
2003 |
GMC Safari |
1997-2014 |
Honda CR-V |
2009-2014 |
Honda Fit |
2009-2012 |
Honda Pilot |
1998 |
Jeep Wrangler |
2009 |
Lexus RX350 |
2005 |
Pontiac G6 |
2007-2010 |
Pontiac G6 |
2007-2009 |
Saturn Aura |
2008-2010 |
Saturn Vue |
2008 |
Subaru Legacy |
Attributes |
California Proposition 65 |
WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov |
Class ID |
11, 11 |
Container Volume Cubic Feet - XA |
0.00000 |
Container Volume Cubic Meter - XA |
0.00000 |
Country of Origin (Primary) |
TW |
Finish - XA |
BLACK RUBBER, BLACK RUBBER |
GTIN |
00612314584451 |
Harmonized Tariff Code (Schedule B) |
8536509065 |
Hazardous Material Code |
N |
Item Class - XA |
CME, CME |
Item Height - XA |
0.000, 0.000 |
Item Length - XA |
0.000, 0.000 |
Item Width - XA |
0.000, 0.000 |
Life Cycle Status Code |
Available to Order |
Master Case Height Inches - XA |
0.000 |
Master Case Length Inches - XA |
0.000 |
Master Case Volume Cubic Feet - XA |
0.00000 |
Master Case Weight Lbs - XA |
0.000 |
Master Case Width Inches - XA |
0.000 |
Material - XA |
THERMOPLASTIC RUBBER |
Mount Type Description - XA |
Not Applicable |
NAFTA Preference Criterion Code |
B |
Pallet Qty - XA |
0.000 |
Pallet Total Height Inches - XA |
0.000, 0.000 |
Pallet Total Weight Per - XA |
0.000, 0.000 |
Parcel Allowed - XA |
Yes, Yes |
Price Code - XA |
E15, E15 |
Product Weight - XA |
0.000, 0.000 |
Rate Class - XA |
65.0, 70.0 |
Retail Height - XA |
2.000, 2.000 |
Retail Length - XA |
9.000, 9.000 |
Retail Width - XA |
4.000, 4.000 |
SDR Required Flag |
N |
Sales Family Code - XA |
ELECT, ELECT |
Sales Family Description - XA |
ELECTRICAL COMPONENTS, ELECTRICAL COMPONENTS |
Sales Group Description - XA |
RV HARNESS, RV HARNESS |
Shipping Weight - XA |
0.170, 1.000 |
Side Application Type Description - XA |
Not Applicable, Not Applicable |
Tariff 301 - XA |
No, No |
Truckload Volume Cubic Feet - XA |
0.00000, 0.00000 |
Warranty |
One-Year Limited Warranty, One-Year Limited Warranty |